Pembelian Tower Lightning Arrester (TLA) 132kV for Asset Maintenance, Transmission Division, TNB

Pembekalan 500kV Alatubah Arus (CT) untuk Jabatan Grid Maintenance, Bahagian Grid, TNB
1st October 2018
Orasko awarded Supply, Delivery and Installation of Electrical Works at PMU Senibong Switching Station by Pembinaan Tajri Sdn. Bhd.
4th October 2018

Pembelian Tower Lightning Arrester (TLA) 132kV for Asset Maintenance, Transmission Division, TNB

Share this:

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud